PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Electrical lighting control boxes at the 2nd floor Facing East.jpg Installed exterior framing at the 1st floor Facing South.jpg Installing Fire Alarmn boxes at the 2nd floor Facing North.jpg Installing panel boards at the 1st floor Electrical Room Facing East.jpg Motorized damper controllers.jpg
Next page Electrical lighting control boxes at the 2nd floor Facing East
Electrical lighting control boxes at the 2nd floor Facing East